Contaminated Land

Phase 1 Desk Study Report

The aim of a phase 1 desk study is to establish the presence or absence of potential risks associated with historical uses of the land and its wider environmental setting.

Get Your Fast, Free Quote

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Your Name?*
Fast Quotes
Quick Turnaround
Full UK Coverage
Guaranteed Acceptance

How it Works

1

Tell us about your project

Fill out the short form above or give us a call on 01925 599 052
2

Review your quote

We’ll email a quote for you to review, and answer any questions you may have. We'll also tell you current turnaround times.
3

Get your report

Give us the go ahead and we’ll get to work immediately. We’ll issue your report as soon as it's ready.
HomeServices
Phase 1 Desk Study Report
Need a quote now or have a question? 

Our phase 1 desk study reports are usually requested by clients looking to do one of the following:

  • Have a planning application accepted by their local authority
  • Discharge a planning condition attached to an existing permission
  • Meet local authority building control (LABC) or NHBC requirements
  • Insure, purchase, or fund the purchase of a property

The aim of a phase 1 desk study is to establish the presence or absence of potential risks associated with historical uses of the land and its wider environmental setting.

Information gathered in the report is used to develop a conceptual site model (CSM), in line with government guidance including CLR11. Along with the CSM, the key output from a phase 1 desk study report is the preliminary risk assessment, or PRA.

Our methods ensure key questions are answered at this early stage. This prevents the unwarranted expenditure that can result from undertaking intrusive ground investigation without good reason.

A solid understanding of construction methods is also essential, but often overlooked undertaking contaminated land risk assessment. Real experience enables us to provide pragmatic expert opinion and realistic suggestions applicable to the development process.

Our phase 1 reports are produced by specialists, tailored to your requirements, and guaranteed to be accepted by local planning authorities, building control, lenders, or any other party as the case may be.

phase 1 desk study reportsThe priority during any phase 1 desktop study should be to identify any potentially significant risks to human health or the wider environment, and ensure that time-consuming intrusive investigation works are only undertaken where necessary.

It can often be demonstrated via the phase 1 report that no further assessment is necessary, making the desk study an essential cost-saving step in any potentially contaminated land assessment.

Understanding gained in the completion of a phase 1 environmental survey also enables any further efforts to be optimised, ensuring key questions are answered without unnecessary cost, for instance by avoiding laboratory analysis for contaminants that are unlikely to have been brought onto the site given its previous use.

Is a Phase 1 Desk Study Report really necessary?

The National Planning Policy Framework (2019) dictates that planning policies and decisions should ensure that any new development must be appropriate for its location, taking into account the effects of (potential) pollution on health or the environment.

The NPPF sets out that to prevent unacceptable risk, the sensitivity of the proposed development and its surrounds should be taken into account, and that responsibility for ensuring a safe development rests with the developer and/or landowner.

A desk study is the most cost effective way of ensuring these requirements are met. The NPPF replaced the similarly worded Planning Policy Statement 23: Planning and Pollution Control (November, 2004), in March 2012.

In line with the NPPF, suitability of the site for the proposed use is demonstrated by assessing the impacts of any any previous or adjacent land uses on the development proposals.

This is where knowledge and experience of not only historical industrial practices and the contaminated land regime, but also the construction process, are invaluable in reaching robust, pragmatic judgement of the risks potentially posed.

Where we undertake phase 1 contamination reports in relation to property or business transactions, this assists the parties in avoiding the transfer of potential environment liability to them.

Complete the short form below for fast, free quote, today.

Fixed Cost Phase 1 Desk Study what's included?

Phase 1 Desk Study

Adeptus phase 1 desk studies provide concise but comprehensive assessment of the potential for a particular site to pose unacceptable risks to health or the environment, or be deemed contaminated land.

This involves the collation of detailed information required to develop a preliminary conceptual site model, including details of the site's historical use, likely contaminants of concern (if any), environmental setting and sensitivity of proposed use.

This information is interpreted by our specialist contaminated land consultant and forms the basis of the preliminary risk assessment.

The conceptual site model is an important part of phase 1 contaminated land assessment and should clearly describe all potentially significant pollutant linkages (SPL) thought to be present at the site. SPL are based on the source, pathway, receptor concept.

Qualitative risk assessment is then undertaken to determine the level or absence of risk is in relation to such pollutant linkages.

Adeptus Phase 1 Desk Study Contamination Reports include the following as standard:

  • Environmental setting surrounding land use, ecosystems, statutory designations, Environment Agency permits, hazardous/CoMAH sites
  • Expected geology, hydrogeology and sensitivity of groundwater resources
  • Hydrology and flood risk - proximity and sensitivity controlled waters
  • Detailed site history, with reference to potentially contaminating activities
  • Contaminant sources potentially present on the site and surrounding area
  • Receptors potentially at risk (e.g. people, property, controlled waters, ecosystems)
  • Site walkover/reconnaissance visit, allowing identification of unrecorded features and more complete assessment
  • Pathway identification and characterisation (could the receptor become exposed to the source)
  • Conceptual Site Model - understanding of the interaction between the above elements, as per CLR11, CIRIA C552 and C665
  • Preliminary Risk Assessment - screening out and prioritisation of insignificant vs potentially significant risks
  • Findings clearly communicated in relation to current or any proposed use

Get your Fast, FREE quote

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Your Name?*

About the Author

After growing up around the building trade, I spent the first decade of my formal career delivering demolition earthworks projects, and to a lesser extent section 278 works. As a geo-environmental consultant since 2015, I am committed to providing practical advice and solutions working in partnership with clients. Project experience ranges from single self build plots, to a legal case where the people of Oakey Township reached an out of court settlement for $212m in compensation for pollution of their drinking water by a Royal Autralian Air Force base.
Danny Fisher
Danny Fisher
Principal Consultant
Adeptus Environmental

What Our Clients Say...

Provided promptly and professionally an in-depth report that lead to receiving a BREEAM In Use accreditation. Would highly recommend.
M. Campbell, Knight Frank
First rate for all our land contamination needs. Not only did they produce a phase 1 report in super quick time, then followed up with a remediation statement in 48 hours. If you need something doing and quickly, I would not hesitate to recommend Adeptus.
Sam Newby-Ricci
Used this company for its professional services they turned around in 5 days whilst they quoted 14. TRULY IMPRESSED. Which now means I have to pedal fast on other pending matters which needed this report great job..
Harpreet Sawhney

Joe Bloggs

Chief Executive Officer
Developer Ltd.
"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua."
5 stars Google Reviews
Testimonial Image

Mr & Mrs Self-Build

Independent Developers
"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua."
5 stars Google Reviews

Some Architect

Chief  Architect
Smart Company
"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua."
5 stars Google Reviews

FAQs

We cover the whole of the UK and have worked overseas in the past. Our network of regional offices ensures we have your location covered. We always assign your project to a team member working in the area so that travel time is not a factor.

Warrington | Manchester | Birmingham | London

A walkover survey is a visual inspection of a development site conducted on foot to:

Purpose:
- Verify desk study information
- Identify potential contamination sources
- Assess current site conditions

What's examined:
- Structures, tanks, pipework, drains
- Ground cover and vegetation
- Adjacent land uses
- Evidence of staining, odours, or contamination

Timing:
Conducted early in the environmental assessment process, typically after the desk study phase.

Outcome:
Informs the design of further ground investigation works and helps develop the conceptual site model for contaminated land risk assessment.

It's essentially a "boots on the ground" reconnaissance to see what's actually there versus what the paperwork suggests.

An environmental report gives you confidence in your project. It satisfies planning requirements, keeps your professional team informed, and ensures you're building on solid foundations - both literally and figuratively. If issues are found, they're usually manageable with proper planning.

You'll know exactly what you're working with from day one. This means more accurate budgets, appropriate design solutions, and smoother planning applications. Most importantly, it demonstrates to all stakeholders that you've done your homework.